The project
A full-floor, 24,000 SF office fit-out on the 10th floor of 125 High Street, built in about 15 weeks in the summer of 2019.
- Open workstation areas
- A café with pendant lighting and a wall of windows
- A new elevator lobby and glass entry
A full-floor, 24,000 SF office fit-out on the 10th floor of 125 High Street, built in about 15 weeks in the summer of 2019.