Elaine Construction
Back to Academic

The Harvard Crimson

Newsroom renovation, Cambridge, MA
Client
The Harvard Crimson
Sector
Academic
Project type
Full interior renovation of a historic building
Architect
KPMB Architects
Delivery
CM at Risk
Completed
January 2026

Founded in 1873, The Harvard Crimson is the nation’s oldest continuously published daily college newspaper. For its 150th anniversary, it renovated its historic home for a digital-first newsroom.

A newsroom for today’s Crimson

Elaine gutted and reconfigured all three floors of the 110-year-old building to make room for a modern newsroom and collaborative workspaces.

  • New interconnecting stair to tie the floors together
  • Full MEP upgrades to modernize the building’s systems
  • Targeted envelope upgrades, including new windows and roofing, for long-term performance and energy efficiency
  • A fully accessible path of travel to the Sanctum

Building on a narrow Cambridge street

The site sat on a narrow, one-way street, with another large construction project underway on the same block. Just-in-time deliveries and daily coordination with neighboring contractors and the city kept the job moving and the site secure.

When field conditions didn’t match the drawings, the team worked through solutions with KPMB without giving up schedule or quality. Through the winter, temporary enclosures protected the envelope and roofing work, and the historic building.

Vintage printing press beside a red steel stair on the lower level

More academic work

See all projects
Hayden Library first floor reading room
MIT – Hayden Library
Academic · Cambridge, MA
Severance Hall living room with vaulted wood ceiling at Wellesley College
Wellesley College – Severance Hall
Academic · Wellesley, MA
MIT W20 Student Center stair and lounge
MIT – W20 Student Center
Academic · Cambridge, MA